top of page


Arc Flash Readiness: How NFPA 70E and 70B Come Together in the Real World
Most arc flash programs fail long before the audit begins. The real issue isn’t labels or PPE—it’s missing, outdated, or disconnected electrical data. This post breaks down why NFPA 70E compliance depends on a strong NFPA 70B data foundation, how poor data leads to failed arc flash studies, and what a modern, audit-ready system actually looks like.
Apr 22


NFPA 70B: Guidelines for Predictive Electrical Maintenance
NFPA 70B is quickly becoming a required standard for electrical maintenance, not just a recommendation. This guide explains what NFPA 70B compliance actually requires, how it supports predictive maintenance, and why asset tracking and modern electrical maintenance software are essential for reducing risk, improving uptime, and maintaining long-term system reliability.
Apr 21
bottom of page