Most arc flash programs fail long before the audit begins. The real issue isn’t labels or PPE—it’s missing, outdated, or disconnected electrical data. This post breaks down why NFPA 70E compliance depends on a strong NFPA 70B data foundation, how poor data leads to failed arc flash studies, and what a modern, audit-ready system actually looks like.